Shell Pandan – Distribution Terminal Pipe Bridge and Pipe Supports


Developer: Shell Eastern Petroleum (Pte) Ltd. (SEPL)
Client: AMEC Foster Wheeler Asia Pacific Pte Ltd/Rotary Engineering Limited
Sub-Con: Steelmech Pte Ltd
Duration: Jun 2018 to Jul 2018
Weight: 150 Tons

Leave a Reply

Your email address will not be published. Required fields are marked *